The Kitchen Remodel has turned the corner. It’s beginning to look like like a real kitchen. Or, as my brother says, ‘the taking out is over and now you’re putting things in.’ Good way to look at it.
So where are we?
- Design Complete, Appliances Ordered, Cabinets Ordered: CHECK
- Cabinets and appliances removed: CHECK
- Asbestos Abatement: CHECK
- Fixtures and cabinet handles ordered: CHECK
- Backsplash ordered: CHECK
- Granite Ordered: CHECK
- City Permit in Place: CHECK
- Dumpster arrives (just in time to put all of the tree damage from the Mother’s Day snow storm): CHECK
- Structural walls and ceiling removed: CHECK
- Plumbing moves and changes completed: CHECK
- Electrical moves and changes completed: CHECK
- City Inspection: CHECK and PASSED WITH FLYING COLORS
- Cabinets delivered: CHECK
- Drywall installed: CHECK
- Tape, Mud and Texture completed: CHECK
- Wood Floor Patches: CHECK
- Downstairs Doors Installed: CHECK
- Cabinets Installed (except for a couple of pieces to be replaced): CHECK
- Counter top Template: CHECK
AND YET TO COMPLETE:
- Appliances Installed:
- Lighting and Plumbing Installs Completed:
- Final Wood Trim and Crown Molding Installed:
- Countertop Installed:
- Backsplash Installed:
- Wood floor refinished:
- Painting:
- Dogs go into depression with all of their new friends gone:
- Move furniture back into the house:
- Glass of Wine and a big sigh of relief: CAN’T COME SOON ENOUGH
Once all of the work is done, I will post the before and after shots. Stay tuned!
One thought on “Kitchen is on the Uphill Slide”